Biohort Factory III
A comprehensive firefighting infrastructure was installed for the Biohort Plant III in Drautendorf: 12,200 sprinkler heads, 32 indoor hydrants, and a 1,200 m long outdoor hydrant ring with seven hydrants. The supply is provided by a pump center with two sprinkler pumps (each 10,000 l/min at 9 bar) and two steel tanks, each with a capacity of 425,000 l. The site thus has a powerful and self-sufficient fire extinguishing system.
Drautendorf, Austria
Client:
Biohort
Execuion period:
Comprehensive Fire Protection Modernisation
For the Libyan steel plant LISCO in Misurata, a comprehensive fire protection project was implemented that included the modernisation and expansion of all fire detection, water, and foam extinguishing systems. In addition, old halon gas extinguishing systems were replaced with modern nitrogen and CO₂ extinguishing systems, providing the plant with a fully autonomous fire protection and maintenance infrastructure.
Misurata, Libya
Client:
LISCO
Execuion period:
02/2018 – 10/2018
Gas Extinguishing System
For the expansion of the Búrfell hydropower plant, ACCURO Sonderlöschanlagen GmbH was commissioned by ANDRITZ Hydro to implement a comprehensive fire protection system. A nitrogen extinguishing system and a modern fire detection system reliably protect the generator, oil, and switch rooms, enabling both automatic and manual activation in the event of a fire.
Iceland
Client:
ANDRITZ Hydro
Execuion period:
02/2018 – 10/2018
Power Plant Fire Protection
As part of the rehabilitation of the largest hydropower plant in Nurek, Tajikistan, the fire detection, control, and extinguishing systems were completely renewed by ACCURO Sonderlöschanlagen GmbH. Modern deluge, foam, and inert gas extinguishing systems, as well as a new internal hydrant system, provide comprehensive fire protection and ensure the long-term operation of the country’s energy supply.
Nurek, Tadschikistan
Client:
Kunde #4
Execuion period:
ca. 2019 – 2029
Extinguishing System for Diesel Power Plant
MAN Diesel & Turbo constructed a power plant for the Arabian Cement Company (ACC) in Rabigh, Saudi Arabia, to supply electricity to a cement factory. ACCURO Sonderlöschanlagen provided the complete fire extinguishing system, including the fire detection system, gas extinguishing system (HFC227ea/FM200), foam extinguishing system, and water spray extinguishing system, ensuring comprehensive fire protection for the facility.
Rabigh, Saudi Arabia
Client:
Arabian Cement Company (ACC)
Execuion period:
04/2016 - 11/2018
Gas Extinguishing System for Sensitive Storage Rooms
For Unterweger Oils GmbH in Assling (East Tyrol), ACCURO Sonderlöschanlagen GmbH implemented a multi-zone ACCURATFLOW-INERT gas extinguishing system using nitrogen to protect the valuable essential oils. The residue-free extinguishing concept preserves product quality and ensures reliable safety. ACCURO handled the planning, installation of the gas extinguishing system including fire detection and control, as well as commissioning, training, and certification by an authorised inspection body — all from a single source.
Assling, Austria
Client:
Unterweger Oils GmbH
Execuion period:
2024 – 2025
Fire Protection for Listed Architecture
For the Kunsthaus Gmünd in Carinthia, ACCURO Sonderlöschanlagen GmbH implemented a low-pressure water mist extinguishing system from the manufacturer VID FIREKILL as part of the renovation of a listed historic building. Since adding an additional staircase or implementing conventional structural fire protection measures would have unacceptably affected the historic fabric, preventive fire protection was achieved entirely through the extinguishing system.
Gmünd, Austria
Client:
Kunsthaus Gmünd
Execuion period:
2024 – 2025
High-Pressure Water Mist Extinguishing System at the Limberg III Pumped-Storage Power Plant
For the transformer cavern of the Limberg III pumped-storage power plant, ACCURO Sonderlöschanlagen GmbH implemented a high-pressure water mist extinguishing system to protect against fire spread and to reduce smoke and heat. The ACCURO project team successfully handled transport and installation within the underground tunnel system.
Kaprun, Austria
Client:
Verbund Hydro Power GmbH
Execuion period:
Planning and Installation of a Sprinkler System
We were commissioned with the planning and installation of the sprinkler system in Novi Sad. The project includes the installation of around 28,000 sprinkler heads and combines state-of-the-art technology, the highest quality standards, and extensive expertise.
As specialists in fire protection systems, we ensure that people, assets, and buildings are optimally protected — reliably, efficiently, and sustainably.
Novi Sad, Serbia
Client:
Execuion period:
Site Security for Recycling Facilities
In 2021, ACCURO took on the planning, supervision, and delivery of specialized components for object protection in the recycling sector for Egger Holzwerkstoffe GmbH. The focus was on a precisely coordinated protection concept for particularly demanding areas of the facility, where high material throughput and mechanical processes pose an increased fire risk.
The scope of services included technical planning and support, as well as the provision of selected special components for plant engineering.
Lexington, USA
Client:
Egger Wood Products, LLC
Execuion period:
11/2022 – 12/2022